Worker Accommodation — Medium-Density | Building Solution Australia

Concept PlanClass 1a / Class 2 / Class 3

Worker Accommodation

Fast, durable, and relocatable workforce housing

25 floor area1 bedroom1 bathroom1 storey

Concept Plan — this floor plan is for illustrative purposes only. It does not represent an approved design. Subject to design development, engineering, and planning approval.

Purpose-built worker accommodation for mining, construction, infrastructure, and agricultural projects — modular, durable, and designed for rapid deployment. Available as permanent or relocatable configurations. Compliant with relevant accommodation standards.

Floor Plan

Concept Plan

Single-occupancy module: sleeping area, bathroom with shower/WC/vanity, kitchenette, storage. Modules can be combined into accommodation villages with shared facilities. Dimensions indicative only.

Concept Plan — indicative layout only, subject to design development and approval

Concept Plan — indicative layout only, subject to design development and approval

Internal Layout

Single-occupancy or shared configurations. Modules can be combined with shared dining, recreation, and laundry facilities. Designed for rapid deployment and relocation.

External Design Options

  • Colorbond steel — standard range
  • Insulated panel system
  • Painted fibre cement

Construction Method

Modular construction — factory-built modules transported to site and assembled. LGS framing with factory-fitted bathroom, kitchenette, and sleeping area. Designed for rapid deployment and relocation.

Product Specifications

structureLGS framing — modular construction
party wallsAcoustic separation between modules — Rw 45 minimum
floor groundSteel bearer frame or concrete slab
floor upperNot applicable — single-storey modules
roofColorbond steel — insulated panel
walls externalInsulated panel system or LGS with Colorbond cladding
walls internalPlasterboard lining
insulationHigh-performance insulation — suitable for extreme climates
windowsAluminium powder-coated — double glazed
kitchensFactory-fitted kitchenette — microwave, bar fridge, sink
bathroomsFactory-fitted bathroom module — shower, WC, vanity
laundryShared laundry facilities — accommodation village
garageNot applicable — car parking provided separately
electricalSingle-phase or three-phase — site-specific
plumbingFactory-fitted — site connection
energy ratingNCC compliant — climate zone specific

Standard Finishes

  • Colorbond steel cladding
  • Colorbond roof
  • Vinyl plank flooring
  • Ceramic tiles — bathroom
  • Durable commercial finishes throughout

Upgrade Packages

Shared Facilities Village

Dining hall, recreation room, laundry, and ablutions block — complete accommodation village

Extreme Climate Package

Enhanced insulation, heavy-duty air conditioning, and weatherproofing for extreme climates

Relocatable Package

Engineered for relocation — lifting points, transport tie-downs, and site connection provisions

Typical Applications

Mining and resources projectsConstruction site accommodationInfrastructure project workforce housingAgricultural worker accommodationEmergency and disaster relief housing

Approval Considerations

Worker accommodation may be approved as temporary or permanent development depending on location and intended use. Remote and regional approvals vary significantly. Seek planning advice for your specific project location.

Project Examples

  • Worker accommodation village — 120 modules — Regional Queensland
  • Construction site accommodation — Infrastructure project — NSW

Important Notice

All floor plans, specifications, and product information are indicative only and subject to change without notice. Concept plans and indicative layouts are for illustrative purposes only and do not represent approved designs. Final designs are subject to design development, structural engineering, services coordination, and planning and building approval. Building Solution Australia does not guarantee that any product can be approved or constructed on any specific site without site-specific assessment. Consult a qualified building professional and your relevant planning authority before making any decisions based on this information.